Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
en:projects:details:multisync [2011/10/03 13:26]
masoud
en:projects:details:multisync [2011/10/03 13:35]
masoud
Line 5: Line 5:
 contacttel: 021 6937529 contacttel: 021 6937529
 contactroom:​ BC 150 contactroom:​ BC 150
-type : master_semester ​+type : master semester ​
 status : available status : available
 created_dt : 2011-09-25 created_dt : 2011-09-25
-taken_dt :  +taken_dt : YYYY-MM-DD 
-completed_dt : +completed_dt : YYYY-MM-DD
 by :  by : 
 output_media :  output_media : 
Line 17: Line 17:
 ---- ----
  
-bb+The goal of this project is to carry extensive simulations of a multicast file synchronization technique in a network simulator. The student should be familiar with network programming and performance evaluation of the network protocols. 
 +